Master tub installed and plumbing connections done |
 |
5 ton AC unit installed and mechanical inspection completed. |
 |
Guest tub and plumbing connections |
 |
Fireplace chase wrapped and ready for stucco |
 |
Dormer warpped and ready for stucco |
 |
350 ft trench dug to rerun the electrical line for the water well.
Rocky really enjoyed this job. |
 |
Trench from house to connect water line to well. |
May 6, 2011 - Nik, Clint and Cole are vacationing NOLA and will be christening Cole on May 15th.
 |
Ahh, our little Prince on his first visit to the
property and his new playground. |
 |
Cole says "Gigi, can I drive the golf cart?" |
 |
Clint looking at Cole enjoying riding the cart with Mom and Gigi.
|
May 9, 2011
 |
Preparing the base stucco coat |
 |
Applying base stucco coat to dormer |
 |
Roofers started Monday, May 9th |
 |
Applying stucco color.....Irish Coffee |
 |
Plumbers finalizing work and another inspection down....yeah! |
 |
Front view L-R: master closet, entry, office than garage. |